
Here are some pictures of the tile as it is being installed. It took 3 days to get it all in place. Then a fourth day for the grout.

I am pleased with the way the tile pulls together the color of the cabinets, the countertop, and the hardwood in the adjoining areas.

Of course, we had to pull out the dishwasher and refrigerator. These were parked in the living room and I set up a mini-kitchen on the dining room table. We were not to walk on the tiles for 12 hours after they were installed. Even though we used paper plates, there were still a lot of dishes to drag down the hall to the utility sink - especially the day of Breckin's birthday party!
No comments:
Post a Comment