Well, we have finished installing the hardwood flooring in our home's upper level. We have installed around 1500 square feet of flooring and it only took us 4 months! We were doing a lot of other fix ups also, as we went along. Anyway, the bedrooms and hallway were a bit more challenging because there are odd angles in our home and the flooring was installed parallel with the walls in the living room, family room, and hallway, but we just kept going in the same direction as the hallway turned the corner which meant all the bedroom flooring and half the hallway flooring is installed at a diagonal across the room.
No comments:
Post a Comment